Clark County Public Utilities

Clark County Public Utilities Clark Public Utilities requested one outdoor Enclosure, housing two independent 15 kV Metalclad Switchgear lineups connected through a tie breaker and bus duct. The enclosure contains a communication panel, one AC panel-board, one battery bank and two DC panel-boards. The Metalclad Switchgear consists of two 2,000 A main breakers, one 2,000 A…

San Diego Metropolitan Transit System

San Diego MTS Another delivery for the San Diego Metro Light Rail extension. This is of 1 of 17 total enclosures that Crown will deliver in 2020. Dimensions – 50′ L x 16′ W… Over 80,000 lbs!!!! 13 units completed so far for the San Diego extension! With 4 more to go, Crown will continue…

Sunnybrook Hospital

Stonnybrook Hospital 2-cell lineup for Sunnybrook Hospital in Toronto, Ontario, Canada Metal-clad switchgear NEMA-12 (sprinkler proof) Consists of: Toronto Hydro Metering cell with Bottom Entry Cell for a generator breaker with both line and load PTs with Top Exit Ratings: 15kV 1200A 25kA (2 sec) 95kV BIL Industry Industrial Other Industrial Projects Industrial Richmond Refinery…

LG&E KU Mobile Trailer

LG&E KU Mobile Trailer This Trailer is The First of it’s Kind! Louisville Gas and Electric Company and Kentucky Utilities Company, part of the PPL Corporation (NYSE: PPL) family of companies, are regulated utilities that serve a total of 1.2 million customers and have consistently ranked among the best companies for customer service in the United…

Richmond Refinery

Richmond Refinery Chevron oil refinery awarded contract to manufacture SCADA Cabinet, complete integration, and full functioning testing to ensure zero problems encountered during field commissioning. Industry Industrial Other Industrial Projects Industrial Sunnybrook Hospital Learn More Talk with us about our products.We can help you with your custom system needs. Get A Quote A Day At…

Solar Inverter Building

Solar Inverter Building A California based construction company placed an order for a pre-engineered steel enclosure housing three solar inverters that tie into a PV Solar Generation Station in the Central Valley. Our scope of services include design coordination for a self sustaining integrated system complete with inverters, transformers, power panels and breakers as well…

Settlers Trail Wind Farm

Settlers Trail Wind Farm A Midwestern based wind farm developer teamed with multiple engineering, procurement and construction firms ordered a Control Building complete with Protective Relay and Control Panels fabricated and fully tested in house coming together on our tightest deadline to date in the season’s worst weather all within budget. Industry Renewable Other Renewable…

Tehachapi Renewable Project

Tehachapi Renewable Project A Southern California Utility placed an order for over (200) substation control panels to be delivered to three 500kv substations along the TRTP- Tehachapi Renewable Transmission Project. Crowns scope of services including enhanced FAT testing to ensure zero problems encountered during field commissioning. Read the full story Industry Renewable Other Renewable Projects…

Traction Power Supply Substations

Traction Power Supply Substations As a subcontractor on the MTA of Los Angeles’ Blue Line rehab project, Crown is contracted to manufacture and integrate (20) Traction Power Substation (TPS) enclosures through 2014. The TPS enclosures are integrated with a variety of equipment; AC Switchgear, DC Switchgear, Rectifier Transformers, SCADA Cabinet, Fire Detection System, as well…

So. Cal. Municipality Enclosure

So. Cal. Municipality Enclosure California municipality awarded the contract to manufacture 30’x 66′ Control Building integrating low voltage switchgear and motor control centers. Steel pillars were designed and fabricated in-house. Industry Utilities Other Utility Projects Utilities Clark County Public Utilities Learn More Utilities LG&E KU Mobile Trailer Learn More Utilities Californian Municipality Switchgear Learn More…